پروژۀ دیوار والکریت پارک کودک قاصدک
اجرای متر مربع انواع دیوارهای داخلی و پیرامونی
در سه طبقه
موقعیت مکانی:
ابتدای جادۀ مشهد شاندیز
کارفرمای محترم:
بلابلابلا
Project Implementation Activities:
Drilling of 3 wells and 5 wells and one well gas injection well The creation of a unit of operation with a nominal capacity of 55 thousand barrels per day All pipelines and pipelines in the first phase of the project Drilling 15 development loops, 3 gas injection wells and one wells water disposal Zayed, along with the creation of a unit of operation with a nominal capacity of 165 thousand barrels of oil On the day, including all lines of flow and well-developed facilities in the second phase
– Feasibility Study Phase III was conducted by ENI
– Define the descriptive stage of the design and preparation of documents for this part of the work using internal resources
Key layout times:
Date of Contract Entry: April 13,
Production of 50,000 barrels per day will be achieved on August 83
Production forecast reached 160 thousand barrels per day: September, 2002
Forecast of gas injection at 280 million cubic feet per day: Spring 2010